Soros Logo

SOROS ASSOCIATES: Engineers & Contractors

ABOUT US / HOME PAGE
CARGO HANDLING SYSTEMS
PORT DEVELOPMENT
OFFSHORE TERMINALS
TRANSPORT SYSTEMS
SYSTEM SIMULATION
ENVIRONMENTAL PROTECTION
REHABILITATION & UPGRADING
LITERATURE REQUEST
PARENT COMPANY
CONTACT US

CARGO HANDLING SYSTEMS

PROJECT: Sepetiba Dual Linear Loader

The Sepetiba Dual Linear Loader was commissioned in September 1999 for Compaghia Portuario Bahia de Sepetiba (CPBS) at Sepetiba Bay, State of Rio de Janeiro, Brazil. It was designed to load iron ore into bulk carriers ranging from 40,000 to 230,000 DWT. The loader is capable of traversing along the ship end to end hatches, and shuttling the boom in and out according to the ship loading plan.

Principal Features:

  • Design capacity: 10,000 TPH of iron ore
  • Boom conveyor: 1600 mm
  • Boom outreach: 48m
  • Ship deck coverage: 230 m
  • Boom length: 53 m
  • Front portal travel: 1m
  • Rear portal travel: 27.7m
  • Shuttle travel: 54 m
Click Image to Enlarge
Sepetiba Bay Loader

Click Image to Enlarge
Elevation: 10,000 TPH
Dual Linear Loader
Click Image to Enlarge
Aerial View: Approach Conveyor on Offshore Trestle and Dual Linear Loader
Click Image to Enlarge
Approach Conveyor Freed to Tail End of 10,000 TPH Dual Linear Loader
Click Image to Enlarge
Approach Conveyor on Offshore Trestle and Tail End of 10,000 TPH Dual Linear Loader
Click Image to Enlarge
10,000 TPH Dual Linear Loader Discharge into Vessel Hatch

HOME - CARGO HANDLING - Sepetiba Dual Linear Loader Project


© Copyright 2007 SOROS ASSOCIATES. All rights reserved.
Suggestions and feedback are welcome at webmaster@sorosassociates.com.