PROJECT: MIDTAP Loading Facility
Engineering,
procurement and construction management services were provided by
Soros for a new liquid and solid petroleum products loading facility
for MIDTAP (Middle Eastern Tankage and Pipeline) . The two berth
facility loads up to 50,000 DWT tankers with petroleum products
from a refinery. Each berth is equipped with three 10 inch loading
arms, two for petroleum products and one for accepting waste from
the ships. The dry bulk material handling system consists of a petroleum
coke storage pile which is stacked and reclaimed by mobile equipment.
The petroleum coke is conveyed to the ship loader at 1,000 MTPH.
HOME - PORT
DEVELOPMENT - PROJECT: MIDTAP Loading Facility
|